IICRC S520-compliant removal across every scenario — surface colonies, cavity infestations, post-water-event growth, HVAC contamination.
Category Assessment
📋Water Category Classification & Protocol Selection
Water source classification determines PPE requirements, containment tier, and disposal protocol on every Aberdeen mold job. We assess and document the water category before work begins.
Containment
🔥Negative Air Containment Setup
Physical containment is established before any material removal — 6-mil poly barriers, zipper entries, HEPA negative air machines creating inward airflow, and sealed HVAC registers. Spore migration during removal is prevented, not managed after the fact.
Extraction
🔨Contaminated Material Removal
Physical removal of all contaminated porous materials from your Aberdeen, MD property — properly bagged and disposed. Remaining surfaces HEPA-vacuumed before biocide application.
Treatment
💧EPA Biocide Application
EPA-registered biocide application on all remaining structural surfaces after extraction — category-appropriate product selection, documented application, and optional encapsulant for salvageable framing.
Drying
💨Structural Drying Where Needed
When residual moisture remains in structural materials after removal, we deploy desiccant or refrigerant dehumidifiers and air movers — logging daily psychrometric readings against IICRC drying targets until materials reach equilibrium moisture content.
Clearance
📄Independent Post-Removal Air Sampling
Third-party IH clearance sampling after every Aberdeen, MD removal job. Accredited lab results, written clearance report — objective confirmation the removal achieved its goal.